Mercedes Showroom, Brentford
Supply, manufacture and installation of the Structural Steelwork and landing only of Pre-cast Stairs / decking packs.
Supply, manufacture and installation of the Structural Steelwork and landing only of Pre-cast Stairs / decking packs.
Supply, manufacture and installation of the Structural Steelwork and installation only of Pre-cast Slabs, Stairs & Lift Shaft.
Schools Project including Holy Family Primary School, A non-denominational Secondary School, A denominational Secondary School and a shared Physical Education and community block.
Supply, manufacture and installation of the Structural Steelwork including Metal Decking, Edge Protection, Pre-cast Stairs, Steel Stair and Off-site Intumescent Paint.
Supply, manufacture and installation of the Structural Steelwork including Metal Decking & off-site Intumescent to the perimeter steelwork. Installation only of Pre-cast Stairs & Edge Protection.
BSB were to supply, manufacture and installation of the Structural Steelwork, Metal Decking and Pre-Cast Stairs.
Supply, manufacture and installation of the Structural Steelwork and installation only of Edge Protection & Pre-cast Stairs.
BSB supplied and erected all Hot & Cold Rolled Steelwork including crane rail.
BSB are supplying and erecting the structural steelwork and pre-cast Slabs to the new University Sports Centre located in a very tight site.
BSB Supplied and erected the steelwork, metal decking, pre-cast concrete and Intumescent Painting.
BSB supplied and erected all Hot & Cold Rolled Steelwork, supplied and fitted 14,000m2 of metal decking and carried out the installation of all pre-cast stairs.
BSB supplied and erected all Hot & Cold Rolled Steelwork including 9nr Trusses which were erected by 2nr cranes.
780t construction of Structural Steelwork, including Pre-Cast Plank & Stairs, Metal Decking and Fire Protection Painting
1450t construction of Structural Steelwork, including the supply of metal decking.
1300t construction of structural steelwork, including the supply of metal decking & fire protection painting.
560t construction of structural steelwork, including the supply of metal decking.
750t construction of a new 102m Support Roof Beam weighing 80t, along with steelwork forming new seating area, including the fitting of all pre-cast slabs & stairs, steel terracing plates and fire protection painting.
We use cookies to ensure that we give you the best experience on our website.